Page 40 - OGA-Sept-2015
P. 40
CHINA FOCUS
OIL & GAS AUSTRALIA

TSC wins deck crane contract from Sinopec

SINOPEC Shanghai Offshore Petroleum One of the kingpost deck cranes to be installed on the Kantan 3 semi-submersible rig. Image courtesy
Company has appointed TSC Group TSC Group Holdings.
Holdings to provide it with two deck cranes
for its Kantan 3 semi-submersible rig.

The 162-200VE kingpost deck cranes,
which have received both American Bureau
of Shipping and China Classification Society
approval, will replace existing cranes on the rig
when they are delivered by 20 September 2016.

TSC said this was the first time the two
groups had worked together, which it said
was evidence the company had tapped a new
market in China, winning the tender with a
quality product and reliable performance.

TSC has 16 crane orders in-hand and will
have an additional eight in the near future.

Kantan 3, which came into use in July 1984,
is China’s first semi-submersible rig, and has a
total length of 91 metres, a width of 71 metres
and a height of 30 metres. l

Tendeka to sell AICDs in China

SERVICES company Tendeka will supply longevity and increase production rates by up Tendeka chief financial officer Alan Pearson.
its range of autonomous inflow control to 50 per cent in comparison to passive inflow Image courtesy Tendeka.
devices (AICDs) to China through Eternal control technology, Tendeka said. right, delivering impressive results throughout
Asia Supply Chain Management under a the world, and we are sure the Chinese oil and
two-year agreement, the company has Company chief financial officer Alan gas industry will welcome it.” l
announced. Pearson said the AICD system could help
increase the yield from Chinese oilfields.
Tendeka said the partnership was a
significant development for the group, “We look forward to developing a strong
adding that Eternal Asia’s global footprint relationship which benefits both companies
could provide Tendeka with greater business and provides the Chinese oil industry with an
opportunities in the country’s oil and gas innovative solution for maximising recovery,”
sector. he said.

The AICDs are sold under the name of Eternal Asia’s director Xu Sun said he
FloSure – with more than 10,000 sold around could envisage many developments in China
the world to date. where deployment of the AICDs would will be
appropriate.
Employed in light and heavy oil wells,
the valves can ensure uniform production “Clearly, the FloSure AICD is not just an
evolution of the inflow control device,” he said.

“It is a revolutionary technology in its own

Triple drilling continues

AUSTRALIAN company Triple Energy has Located about 2 kilometres from the September, Triple said.
started drilling the second of two wells in its previous Xian Xian 1 well drilled by the joint A well pad and access roads have already
Aolong joint venture (JV) project in China’s venture in 2013, the well is targeting several
north eastern province of Heilongjiang. major coal seams for intersection. It is planned been prepared such that the rig can be set-up
to be production tested for six months post immediately on arrival, Triple said.
The company started drilling the Niaoshan completion.
1 coal gas well in the Bird Mountain area in The Yixin 1 well is planned to reach a
June this year, the first of two aiming to degas But in an announcement in late August, depth of about 1,020 metres and was targeting
coal mining leases held by Aolong JV partner Triple said progress on the well had been multiple coal seams, of which some would be
LongMay Coal Mining Company. slower than expected, due to what it said was cored, tested, fracked and production tested.
difficult to drill geology.
Triple, which holds an 80 per cent stake in These wells will be cored for desorption
the JV, said the well had reached 884 metres of As a result, Triple had secured a second rig analysis and tested when completed.
its planned 1,300 metre depth, and had hit the which it sent to the site of its planned second
first of several progosed coal seams. well, Yixin 1. Triple is also evaluating other project
opportunities in China, including the Jixi area,
The rig, which was being moved from south which is included in the Aolong JV exclusive
China, was expected to be in place by early option areas, it said in its June quarter report. l

38 ENERGY PUBLICATIONS CELEBRATING 34 YEARS OF PUBLISHING IN AUSTRALIA
   35   36   37   38   39   40   41   42   43   44   45